1.jpg

main works

Drafting of Construction Project of Sanitary Sewer System of Santo Tomás, Chontales, Nicaragua

Santo Tomas, Nicaragua

  • Contractor: Asociación Momentánea Consorcio Veolia-TecniTasa
  • Budget of the works: 5.067.144,13 EUR
  • Year: 2014

Description

The contracted work consisted in the definition, and budgeting, of the necessary works for the execution of the sanitary sewer system in the city of Acoyapa, in the municipality of Chontales, Nicaragua, through a system of tubulars of PVC of simple wall using diameters ranging between 100 and 630 mm. The installation of the sewerage network was designed complete. The total lengths of the materials used in the branches are 58.992,60 m.

Drafting of Construction Project of Sanitary Sewer System of Acoyapa, Chontales, Nicaragua

Acoyapa, Nicaragua

  • Contractor: Asociación Momentánea Consorcio Veolia-TecniTasa
  • Budget of the works: 2.823.696,39 EUR
  • Year: 2014

Description

The contracted work consisted in the definition, and budgeting, of the necessary works for the execution of the sanitary sewer system in the city of Santo Tomás, in the municipality of Chontales, Nicaragua, through a system of tubulars of PVC of simple wall using diameters ranging between 100 and 500 mm. The installation of the sewerage network was designed complete. The total lengths of the materials used in the branches are 37.382,90 m.

Drafting of Construction Project of the Network of sewage manholes to control discharges at the area of repairs and workshops at Las Palmas Port

Las Palmas de Gran Canaria, Spain

  • Contractor: Las Palmas Port Authority
  • Budget of the works: 91.955,06 EUR
  • Year: 2014

Description

Drafting of referred project, defining and budgeting the works required for the installation of sewage manholes to control the discharge of oil, grease, hydrocarbons or other unauthorized discharges that are done to the existing sewerage network of wastewater at the area of repairs and workshops designated as Zone V in the Port of Las Palmas, so that the works can be executed and supervised with the documentation included in the project.

Ellaboration of technical report, reviewing of calculations and equipment of the brackish water treatment plant of Tindouf

Tindouf, Algeria

  • Contractor: Veolia Water Systems Ibérica, S.L., DHA, Engineering Division
  • Budget of the works: Not available
  • Year: 2014

Description

Review of calculations of the process (filtration, reagents, washing, RO and mixing), review of the functional calculations (pumping), review of the hydraulic calculations of the process line, review the specifications of equipment (pumps, filters, reagents, membranes, valves, ...) and preparation of a report.