1.jpg

main works

Project to repair the submarine outfall Mujeres II, Municipality of San Bartolome de Tirajana, Las Palmas

San Barotolomé de Tirajana, Gran Canaria, Spain

  • Contractor: Técnicas y Montajes Subacuáticos, S.L.
  • Budget of the works: 49.064,03 EUR
  • Year: 2012

Description

Drafting of referred project, in which are defined and budgeted the necessary works for the proper discharge to the sea of the water from the urbanizations Sonnenland, Campo International, Raquetas Campo de Golf, San Fernando (part), Oasis Meloneras 2A and 2B.

Drafting of the project of Remineralisation with calcite beds in the Inalsa - South production center. Municipality of Yaiza. Lanzarote Island. Canary Islands

Yaiza, Lanzarote, Spain

  • Contractor: Water Consortium of Lanzarote
  • Budget of the works: 580.000,00 EUR
  • Year: 2012

Description

Drafting of the project of Remineralisation with calcite beds in the Inalsa - South production center. The works consist essentially providing remineralisation installations needed to comply with the legal requirements of chemical composition of water supply. It includes the design of facilities for remineralisation through calcite and CO2 dosing in order to provide desalinated water with the chemical composition required.

Drafting of the project of the "Works of expansion of the WWTP in Las Matas - Los Peñascales. Community of Madrid"

Las Matas - Los Peñascales, Madrid, Spain

  • Contractor: Isolux Ingeniería S.A.
  • Budget of the works: 5.489.048,81 EUR
  • Year: 2011

Description

Elaboration of the draft of the WWTP and budgeting defining all the elements for a flow of 5.400,00 m3/day, 21.000 hbeq, using the process of biomass attached to a moving bed with inlet manifold from Las Matas for an average flow of 1.865,00 m3/day, and max. of 16.318,80 m3/day and from Los Peñascales for an average flow of 3.535,00 m3/day and max. of 30.931,30 m3/day and outfall discharge for an average flow of 3.535,00 m3/day and max. of 30.931,30 m3/day.

Drafting of the project "System of wastewater treatment of Northeast Tenerife (2nd phase)"

NE Tenerife, Spain

  • Contractor: UTE Corsán Corviam S.A., Isolux Ingeniería S.A. y Servicios y obras canarios, S.A.
  • Budget of the works: 16.453.890,39 EUR
  • Year: 2011

Description

Elaboration of the draft tender for designing the WWTP maximum daily flow of 9.300 m3/day to achieve in three phases, from 5.000 m3/day, 7.000 m3/day, and 9.300 m3/day. We designed a MBR process preceded by a pretreatment tank compact and lamination. The sludge is subjected to a thickening and dewatering, and are subsequently stored in a hopper before discharge to landfill. Finally part of the treated water is passed through an installation of EDR to reduce its salinity.