1.jpg

main works

Drafting of the project of the "WWTP Adeje - Arona, Municipality of Adeje and Arona (Tenerife Island)"

Adeje - Arona, Tenerife, Spain

  • Contractor: UTE Corsán Corviam S.A., Isolux Ingeniería S.A. y Servicios y Obras Canarios, S.A.
  • Budget of the works: 30.000.000,00 EUR
  • Year: 2011

Description

Preparation of the project tender for the WWTP with a design flow of 40.000 m³/day with the necessary facilities for future expansion to 50.000 and 60.000 m³/day, based on the construction of a new treatment line, replacement pump station pumps and expanding the capacity of the WWTP, with a biological treatment system and MBR. It also expands the line with new sludge thickeners dynamic, anaerobic digester, a membrane gasholder and biogas flare.

Drafting of the project of the wastewater treatment plant of El Cotillo, Municipality of La Oliva (Fuerteventura)

La Oliva, Fuerteventura, Spain

  • Contractor: Acciona Infraestructuras, S.A.
  • Budget of the works: 1.800.000,00 EUR
  • Year: 2011

Description of the works

Define and budgeting wastewater pumping station, pressure pipe from the pumping station to the WWTP through a pipe of 200 mm diameter and WWTP for treatment flow rate of 500 m3/day, in two lines of 250 m3/day, in Cotillo, the base solution coincidie with the basis project content of the contest and corresponds therefore to the solution with ultrafiltration membranes, and the solution variant differs in the use of flat membranes for microfiltration.

Engineering development process for supply, installation and initial operation from the reverse osmosis plant in Placilla-Sierralta, Copiapó, Perú

Placilla-Sierralta, Copiapó, Perú

  • Contractor: Valoriza Agua, S.L.U.
  • Budget of the works: 1.008.220,19 EUR
  • Year: 2010

Description

Definition and development of process engineering, dimensioning and calculation of electromechanical equipment and technical assistance in drafting and preparation of technical documents and drawings for bidding of the Reverse Osmosis Plant Placilla-Sierralta, Copiapó, Perú, with a production capacity of 11.016,00 m3/day of product water , an arrangement of 3 racks of 3.672,00 m3/day with a setting of 1 pass in 2 stages and a conversion of 69%, expandable to 14.688,00 m3/day adding a rack.

Drafting of the project of the works of Lanzarote V SWRO, 1 Phase. Municipality of Arrecife. Lanzarote Island

Arrecife, Lanzarote, Spain

  • Contractor: Veolia Water Systems Ibérica, S.L.
  • Budget of the works: 9.000.000,00 EUR
  • Year: 2010

Description

Preparation of the project bidding and budgeting defining all the elements of the base solution and variant: a. Base solution: a total capacity of 12.000,00 m3/day by two racks of 6.000,00 m3/day of reverse osmosis, using pressure exchangers, expandable to 24,000 m3/day in the future. b. Variant solution: a total capacity of 12,000 to 14,000.00 m3/day by two racks of 6,000 to 7,000 m3/day of reverse osmosis, using pressure exchangers, expandable to 24,000 to 28,000 in the future.